Monitor Permanent Way Infrastructure (Hot Weather Patrolling) TR 42
Duration: 1 Day
Max Delegates: 10
Overview
This course is designed to train persons who are responsible for undertaking monitoring duties of Track Assets as part of their duties on NWR infrastructure during hot weather. It is designed to develop a person's knowledge, understanding and skills and is therefore particularly suited to persons required to prove their capability in these area.
The aim is to provide delegates with the skills and underpinning knowledge required to monitor Plain Line Track assets during hot weather in line with TR42.
Download PDFOther Training Sectors
Other Training Sectors
- COSS Recert OLP/CRP (Inc PTS AC / DCCR & PC Recert )
- OLEC 1: Access Overhead Lines Construction Sites - Session 1
- COSS Recert OLP/CRP (Inc PTS AC / DCCR Recert ) Not Inc PC
- COSS Initial incl OLP/CRP (Incl PTS & DCCR Recert) - 8 Days
- MC/CC 360 Excavator with Attachment Groups 1, 3, 4 and 6 - 8 days
- Book Now
Join Intertrain
What do our trainees think
Very well constructed and delivered, outstanding performance on the trainer's part, both in the classroom and out on the track. I would recommend Archie McNeill to anyone who wishes to learn about overheads - a terrific experience.
Zain Ahmad, CoyleLee had an excellent practical and pragmatic approach towards training. I found him to be very knowledgeable, but more importantly he has fantastic knowledge transfer skills.
Umair Khan, Siemens Rail AutomationI enjoyed the course, it was delivered to a high standard. Kev is an excellent trainer, he is informative and has a great sense of humour. His method of teaching was simplified and thorough - Great!
Thomas Smith, Amey Group Services LtdVery well run course, professionally presented. Good reminder of duties and responsibilities.
Mark Harris, ABC ElectrificationVic was a fantastic trainer, his knowledge of the industry is vast and his delivery was second to none. A great course and trainer - thanks!
Douglas Aitken, Balfour Beatty Rail Limited